magnifying icon Basket
1 item ^

Basket is empty
Login

Login

LOGGED AS

Help

Satisfaction enquiry

SATISFACTION ENQUIRY

Newsletter

Free of charge lifelong learning "Standardization"

FREE OF CHARGE LIFELONG LEARNING "STANDARDIZATION"

Standardisation

Draft standards in public enquiry

DRAFT STANDARDS IN PUBLIC ENQUIRY

Standards organizations

STANDARDS ORGANIZATIONS

  • National standards

  • European standards

  • International standards


Deliverable

 
Free preview
Price
Language
 
CEN/TS 17240:2018 Edition 10/2018
Intelligent transport systems - ESafety - ECall end to end conformance testing for IMS packet switched based systems
  •   
  •   
  •  
  • 122.9 / copy
  •  
 

Abstract

This document defines the key actors in the eCall chain of service provision using IMS over packet switched networks (such as LTE/4G) as: 1) In-vehicle system (3.20) (IVS)/vehicle, 2) Mobile network Operator (MNO), 3) Public safety answering point (3.27) (PSAP), and to provide conformance tests for actor groups 1) - 3). NOTE 1 Conformance tests are not appropriate nor required for vehicle occupants (3.36), although they are the recipient of the service. NOTE 2 Third party eCall systems (TPS eCall) are not within the scope of this deliverable. This is because the core TPS-eCall (3.32) standard (EN 16102) does not specify the communications link between the vehicle and the TPS service provider (3.29). NOTE 3 These conformance tests are based on the appropriate conformance tests from EN 16454 which was published before Internet Protocol multimedia Systems (IMS) packet switched networks were available. This deliverable therefore replicates the appropriate tests from EN 16454 (and acknowledge their source); adapt and revise Conformance Test Protocols (CTP) from EN 16454 to an IMS paradigm; or provide new additional tests that are required for the IMS paradigm. Some 14 112-eCall (Pan European eCall) tests provided in EN 16454 are specific to GSM/UMTS circuit switched communications and not appropriate for the IMS paradigm and are therefore excluded from this deliverable. This document therefore provides a suite of ALL conformance tests for IVS equipment, MNO’s, and PSAPS, required to ensure and demonstrate compliance to CEN/TS 17184. NOTE 4 Because in the event of non-viability or non-existence of an IMS supporting network at any particular time/location, IMS-eCall systems revert to CS networked eCall systems eCall via GSM/UMTS, IVS and PSAPs need to support, and prove compliance to both IMS and CS switched networks. The Scope covers conformance testing (and approval) of new engineering developments, products and systems, and does not imply testing associated with individual installations in vehicles or locations.

Status

Standard - Active

Origin

Technical Committee :
CEN/TC 278 : Intelligent transport systems

Implementation

start of the vote on the project      date of ratification (dor)    20/08/2018
end of the vote on the project      date of anouncement (doa)    31/01/2019
start of the vote on the final project    26/04/2018   date of publication (dop)   
end of the vote on the final project    19/07/2018   date of withdrawal (dow)   


Publication Official Journal
of the Grand-Duchy of Luxembourg
Reference

Relations

Evolutions
prEN 17240

International Classification for Standards (ICS codes) :

35.240.60 : IT applications in transport and trade

magnifying icon Basket
1 item ^

Basket is empty


Warning:
DIN standards can be downloaded only once! After downloading, they are no longer available in the eLibrary.
Begin download?