magnifying icon Basket
1 item ^

Basket is empty
Login

Login

LOGGED AS

Help

Satisfaction enquiry

SATISFACTION ENQUIRY

Newsletter

Free of charge lifelong learning "Standardization"

FREE OF CHARGE LIFELONG LEARNING "STANDARDIZATION"

Standardisation

Draft standards in public enquiry

DRAFT STANDARDS IN PUBLIC ENQUIRY

Standards organizations

STANDARDS ORGANIZATIONS

  • National standards

  • European standards

  • International standards


Deliverable

 
Free preview
Price
Language
 
IEC 62439-4 Ed. 1.0 Edition 02/2010
Industrial communication networks - High availability automation networks - Part 4: Cross-network Redundancy Protocol (CRP)
  •   
  •  
  • 268.3 / copy
  •  
 

Abstract

IEC 62439-4:2010 is applicable to high-availability automation networks based on the ISO/IEC 8802-3 (IEEE 802.3) (Ethernet) technology. It specifies a redundancy protocol that is based on the duplication of the network, the redundancy protocol being executed within the end nodes, as opposed to a redundancy protocol built in the switches. The switchover decision is taken in each node individually. The cross-network connection capability enables single attached end nodes to be connected on either of the two networks. It cancels and replaces IEC 62439 published in 2008 and constitutes a technical revision. It includes the following significant technical changes with respect to IEC 62439 (2008):
- adding a calculation method for RSTP (rapid spanning tree protocol, IEEE 802.1Q),
- adding two new redundancy protocols: HSR (High-availability Seamless Redundancy) and DRP (Distributed Redundancy Protocol),
- moving former Clauses 1 to 4 (introduction, definitions, general aspects) and the Annexes (taxonomy, availability calculation) to IEC 62439-1, which serves now as a base for the other documents,
- moving Clause 5 (MRP) to IEC 62439-2 with minor editorial changes,
- moving Clause 6 (PRP) was to IEC 62439-3 with minor editorial changes,
- moving Clause 7 (CRP) was to IEC 62439-4 with minor editorial changes, and
- moving Clause 8 (BRP) was to IEC 62439-5 with minor editorial changes,
- adding a method to calculate the maximum recovery time of RSTP in a restricted configuration (ring) to IEC 62439-1 as Clause 8,
- adding specifications of the HSR (High-availability Seamless Redundancy) protocol, which shares the principles of PRP to IEC 62439-3 as Clause 5, and
- introducing the DRP protocol as IEC 62439-6.

This publication is to be read in conjunction with IEC 62439-1:2010.

Status

Standard - Active

Origin

Technical Committee :
65C : Industrial networks

Implementation

start of the vote on the project      date of ratification (dor)   
end of the vote on the project      date of anouncement (doa)   
start of the vote on the final project      date of publication (dop)   
end of the vote on the final project      date of withdrawal (dow)   


Publication Official Journal
of the Grand-Duchy of Luxembourg
Reference

Relations

Relations to older standards
IEC 62439 Ed. 1.0

International Classification for Standards (ICS codes) :

25.040 : Industrial automation systems
35.040 : Information coding

magnifying icon Basket
1 item ^

Basket is empty


Warning:
DIN standards can be downloaded only once! After downloading, they are no longer available in the eLibrary.
Begin download?