magnifying icon Basket
1 item ^

Basket is empty
Login

Login

LOGGED AS

Help

Satisfaction enquiry

SATISFACTION ENQUIRY

Newsletter

Free of charge lifelong learning "Standardization"

FREE OF CHARGE LIFELONG LEARNING "STANDARDIZATION"

Standardisation

Draft standards in public enquiry

DRAFT STANDARDS IN PUBLIC ENQUIRY

Standards organizations

STANDARDS ORGANIZATIONS

  • National standards

  • European standards

  • International standards


Deliverable

 
Free preview
Price
Language
 
IEC/PAS 62381 Ed. 1.0 Edition 01/2004
Activities during the factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT) for automation systems in the process industry
  •  
  • 236.5 / copy
  •  
 

Abstract

defines procedures and specifications for the factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT). These tests are carried out to prove that the automation system is in accordance with the specification.

Status

Standard - Superseded

Origin

Technical Committee :
65 : Industrial-process measurement, control and automation

Implementation

start of the vote on the project      date of ratification (dor)   
end of the vote on the project      date of anouncement (doa)   
start of the vote on the final project      date of publication (dop)   
end of the vote on the final project      date of withdrawal (dow)   


Publication Official Journal
of the Grand-Duchy of Luxembourg
Reference

Relations

Evolutions
IEC 62381 Ed. 1.0

International Classification for Standards (ICS codes) :

25.040.01 : Industrial automation systems in general

magnifying icon Basket
1 item ^

Basket is empty


Warning:
DIN standards can be downloaded only once! After downloading, they are no longer available in the eLibrary.
Begin download?