magnifying icon Warenkorb

Der Warenkorb ist leer
Login

Login

ANGEMELDET ALS

Hilfe

Kundenumfrage

Newsletter

Kostenfreie weiterbildung "Normung"

KOSTENFREIE WEITERBILDUNG "NORMUNG"

Normung

Normen-Entwürfe

Normungsorganisationen

NORMUNGSORGANISATIONEN

  • Nationale Normen

  • Europäische Normen

  • Internationale Normen


Veröffentlichung

 
Kostenlose Vorschau
Gesamtbetrag
Sprache
 
CEN/TR 17654:2021 Edition 07/2021
Leitfaden für die Implementierung von BIM-Ausführungsplänen (BEP, en: BIM Execution Plan) und Austausch-Informationsanforderungen (EIR, en: Exchange Information Requirement) auf europäischer Ebene auf EN ISO 19650-1 und -2 basierend
  •   
  •   
  •  
  • 67.3 / Kopie
  •  
 

Abstract

This document deals with the processes involved in the procurement and delivery of information to planning and construction projects, specifically with exchange information requirement (EIR) and BIM execution plan (BEP), considering the administrative processes. This document takes into account international standards and specifications as well as recommended practice. This document is relevant for all parties involved in the tendering of information deliverables. Including both those that require and those that deliver the information. The required information can be relevant for all processes in the life cycle such as design, construction, operation and maintenance and end-of-life processes. It applies above all to e.g. client, asset owners/operators, architects, engineer, contractors, subcontractors etc. This document provides methodology to appointing parties on how to require and agree the right amount, quality and level of information needs. It is also important for appointed parties to be able to assess the quality of existing EIRs and identify possible over-specification or gaps. Based on this, it is possible to estimate and calculate the necessary effort for data creation. This document operationalizes the tendering and appointment process of information deliverables as specified in EN ISO 19650-2:2018. This document does not cover all clauses of EN ISO 19650-2:2018. Its main goal is to provide template examples and guidance for all activities conditioning specification of requirements and deliverables in the production of exchange information requirements and BIM execution plan. Specifically, it covers the “shall” and “shall consider” requirements in EN ISO 19650-2:2018, 5.2.1 (EIR), 5.3.2 (pre-appointment BEP) and 5.4.1 (confirmed BEP). For specification of Scope and out of scope see Table 1 (see Annex A for which part of EN ISO 19650-2:2018 is supported by templates).

Status

Standard - Aktiv

Ursprung

Technisches Komitee :
CEN/TC 442 : Building Information Modelling (BIM)

Annahme

Beginn der Abstimmung über den Entwurf      Datum der Ratifizierung (dor)    30/05/2021
Ende der Abstimmung über den Entwurf      Datum der Ankündigung (doa)   
Beginn der Abstimmung über den Schlussentwurf    04/02/2021   Datum der Veröffentlichung (dop)   
Ende der Abstimmung über den Schlussentwurf    29/04/2021   Datum der Zurückziehung (dow)   


Veröffentlichung im Amtsblatt
des Grossherzogtum Luxemburg
Referenz

Internationale Normungsklassifizierung (ICS) :

91.010.01 : Construction industry in general
35.240.67

magnifying icon Warenkorb

Der Warenkorb ist leer


Achtung:
DIN-Normen können nur einmal heruntergeladen werden! Nach dem Herunterladen, sind sie nicht mehr in der eBibliothek verfügbar.
Download starten?